Solar division

480 megawatts of engineered sunlight, and counting

From a 40 kW warehouse roof to a 250 MW tracker farm — same modelling stack, same crews, same guarantee.

Rows of photovoltaic panels stretching to the horizon

480MW

Capacity built

1.9M

Panels set

99.2%

Uptime

25 yr

Yield warranty

Programs

Four solar programs

Each one costed against your tariff, roof loading and grid connection date.

Rooftop C&I

40 kW – 5 MW

Ballasted or penetrating mounts engineered to your existing roof loading.

Carport & Canopy

100 kW – 12 MW

Structural canopies with integrated EV charging and lighting.

Utility Farm

10 MW – 250 MW

Single-axis trackers, bifacial modules, full interconnection management.

Agrivoltaics

2 MW – 60 MW

Elevated arrays that keep the land in production underneath.

Economics

What a typical 5 MW array returns

Illustrative figures for a Californian industrial rooftop at current tariffs.

7.1 GWh

Annual generation

$1.24M

Annual energy saving

4.6 yrs

Payback period

3,900 t

CO₂ avoided per year